TITX: Metro Manila's Next Transport Hub
Multimodal Terminal Project Aims to Improve Connectivity and Support Transit-Oriented Development.
(PHILIPPINES) The Taguig Integrated Terminal Exchange (TITX) is emerging as a critical anchor in the Philippine government's long-term plan to modernize public transit and enhance regional connectivity. Planned by the Department of Transportation (DOTr) under a Public-Private Partnership (PPP) framework, the terminal will integrate provincial buses, city feeder lines, jeepneys, and urban rail networks into a centralized multimodal facility.
Positioned near the FTI district in Taguig City, TITX will serve as Metro Manila's southern gateway, providing direct transit synergy with mega-rail initiatives, including the North–South Commuter Railway (NSCR) and the Metro Manila Subway Project (MMSP).

TITX builds on the hub-and-spoke model demonstrated by the Parañaque Integrated Terminal Exchange (PITX). By intercepting provincial buses before they enter congested city centers, the terminal aims to reduce traffic on major arteries like EDSA and SLEX while streamlining passenger transfers to intra-city transit systems.
Its location adjacent to Arca South positions the facility at the core of an active commercial and residential growth corridor, accelerating the district's evolution into a prime transit-oriented development (TOD) hub.
Core Planning and Architectural FeaturesThe project is engineered to balance passenger volume, commuter comfort, and commercial viability:
• Multimodal Staging: Centralized bays and staging areas serving provincial buses, city routes, jeepneys, taxis, and point-to-point (P2P) shuttles.
• Rail Integration: Direct, pedestrian-friendly links to the nearby FTI rail stations connecting the NSCR and Metro Manila Subway.
• Optimized Circulation: Climate-controlled concourses, clear wayfinding, and elevated walkways designed to cut commuter transfer times.
• Commercial Integration: Dedicated retail, dining, and commercial office spaces designed to generate non-farebox revenues.
• Intelligent Transport Systems (ITS): Centralized passenger information display systems (PIDS), automated ticketing, smart bay management, and integrated security monitoring.

The project creates major procurement pipelines across the Philippine construction and engineering sectors:
• Civil & Structural: Heavy civil earthworks, foundation engineering, bus ramps, and large-span structural steel framing.
• Building Envelope & MEP: High-efficiency HVAC, intelligent power grids, rainwater collection, and modern life safety systems.
• Specialist Systems & Fit-Out: Automated fare collection turnstiles, digital transit signage, and retail fit-outs.
Beyond physical works, TITX will serve as a catalyst for land appreciation in southern Metro Manila, driving demand for surrounding mixed-use, hospitality, and residential properties.
Project Name
Taguig Integrated Terminal Exchange (TITX)
Developer
Arca South Integrated Terminal Inc. (Ayala Land Inc) in partnership with the Department of Transportation (DOTr)
Location
FTI Special Economic Zone / Arca South, Taguig City, Metro Manila
Building Height
Multi-level terminal complex with integrated commercial/office towers
Site Area
Approximately 5.57 hectares
Status
Pre-construction, right-of-way alignment, and design finalization
Expected Completion
Phased delivery aligned with adjacent mass-transit milestones (target completion date not officially finalized)
(Reported by BuildMartASEAN)